San Lorenzo Hydroelectric Power Plant

SAN LORENZO HYDROELECTRIC PROWER PLANT, 10 MW (IN OPERATION SINCE FEBRUARY OF 2014):

San Lorenzo Hydroelectric is an Electric Generation Plant with 8.6 MW Output and approximately of 40 GWh/year. Is used the flow of the Fonseca River located in the Boca del Monte Jurisdiction, San Lorenzo District of the Province of Chiriqui. It is located 45 km east of the David City. The main purpose of the San Lorenzo HPP is to supply electrical energy at a reasonable cost to Energy System of Panama through a clean and renewable source of energy.

Performed Services:

  • Design, Supply, Manufacturing and Erection of Hydro-mechanical Equipment (cranes, gates, servomotors, Hydraulic units).
  • Bottom Outlet:
  • Hydraulic Tests of the Hydraulic Drive System, with the pressure increase
  • Load Capacity Tests.
  • Support in the Commissioning of the Electromechanical Equipment.