We developed the water intake structure at the pumping station of Finca Alanje, ensuring efficient and safe water collection.
The project included:
- Execution of grey works with high-strength reinforced concrete slabs and walls.
- Assembly of metal structures and roofing, access platforms, and drainage systems.
- Installation of equipment for rainwater management and a temporary power generator.
- Implementation of safety systems, water channeling, and filtration.
- Additional works to ensure operability and protection against rainfall.
This project strengthens the farm’s water infrastructure, optimizing the water supply for its agricultural operations.





