Power Generation Project

Biomass Cogeneration Project

Implementation of a biomass cogeneration system using the Lignodyn CT 20 boiler by H. Bremer, designed to optimize energy efficiency and promote sustainability in the client’s operations:

  • Management and supervision of the import, installation, and operation permits for the boiler before DINASEPI (Panama Fire Department).
  • Logistics coordination for the unloading of equipment at the project site.
  • Execution of lifting and positioning of equipment onto the civil foundations.
  • Internal mobilization of equipment within the project site.
  • Specialized preparation and assembly of the equipment.
  • Supply, fabrication, and electromechanical installation of metal water tanks, powerhouse structure, pipe-rack supports, crane beam supports, and pneumatic piping structure.
  • Comprehensive technical support during system commissioning.

Key Installed Equipment:

  • Lignodyn CT 20 boiler by H. Bremer.
  • 3.65 MW Turbogenerator TGM-WEG, composed of:
    • CT 20 steam turbine
    • RTS 500 gear reducer
    • 15.2 t/h vacuum condenser
    • 5.0 MVA synchronous generator, 13.8 kV, 60 Hz, 1800 rpm
    • 5.5 MVA step-up transformer, 13.8 / 34.5 kV, 60 Hz, 3-phase
    • 34.5 kV switchgear and control panel
    • 1 MVA auxiliary transformer, 34.5 / 0.48 kV, 60 Hz, 3-phase
    • 480 VAC switchboard (MCC)
    • VTF 360/31/GR-BT-2 cooling tower
  • Metal water tanks designed by Renova (Brazil) and manufactured by TRIEST (Panama)
  • 20-ton capacity overhead crane

Impact

This project enables Grupo Agrosilos, S.A. to move toward a more sustainable and efficient operation, aligned with high-level environmental and operational standards.

Year: 2025

Our Experience, Your Success

This project reflects our ability to manage complex projects with precision and professionalism. From planning to execution, our team ensures results that meet the highest standards of quality and safety.