Caña Blanca Substation and Transmission Line
CAÑA BLANCA SUBSTATION AND TRANSMISSION LINE OF SAN ANDRES HPP.
Design, supply, erection and commissioning of the Power Substation of 12.5 MVA – 13.8/230 kV, electromechanical works and construction of the Transmission Line of 230 kV:
Power Substation of 12.5 MVA – 13.8/230 kV:
- Equipment.
- Civil works.
- Mechanical works.
- Secondary electrical works.
- Detail Engineering and Commissioning.
Transmission Line of 230 kV:
- Equipment.
- Civil works.
- Detail Engineering and Commissioning.
- Redesign of Transmission Line.
Protections in Substation:
- Equipment.
- Detail Engineering and Commissioning.
- Physical adaptation for Protection’s Room.