CAÑA BLANCA SUBSTATION AND TRANSMISSION LINE OF SAN ANDRES HPP.

Design, supply, erection and commissioning of the Power Substation of 12.5 MVA – 13.8/230 kV, electromechanical works and construction of the Transmission Line of 230 kV:

Power Substation of 12.5 MVA – 13.8/230 kV:

  • Equipment.
  • Civil works.
  • Mechanical works.
  • Secondary electrical works.
  • Detail Engineering and Commissioning.

Transmission Line of 230 kV:

  • Equipment.
  • Civil works.
  • Detail Engineering and Commissioning.
  • Redesign of Transmission Line.

Protections in Substation:

  • Equipment.
  • Detail Engineering and Commissioning.
  • Physical adaptation for Protection’s Room.