Subestacion Caña Blanca y Linea de Transmision-8
Power Generation Project

Caña Blanca Substation and Transmission Line

CAÑA BLANCA SUBSTATION AND TRANSMISSION LINE OF SAN ANDRES HPP

Design, supply, erection and commissioning of the Power Substation of 12.5 MVA – 13.8/230 kV, electromechanical works and construction of the Transmission Line of 230 kV:

Power Substation of 12.5 MVA – 13.8/230 kV:

  • Equipment.
  • Civil works.
  • Mechanical works.
  • Secondary electrical works.
  • Detail Engineering and Commissioning.

Transmission Line of 230 kV:

  • Equipment.
  • Civil works.
  • Detail Engineering and Commissioning.
  • Redesign of Transmission Line.

Protections in Substation:

  • Equipment.
  • Detail Engineering and Commissioning.
  • Physical adaptation for Protection’s Room.