Construction Project

Construction of Water Intake Structure at the Pumping Station of Finca Alanje

PUERTO ARMUELLES’S BANANA DEVELOPMENT PROJECT

We developed the water intake structure at the pumping station of Finca Alanje, ensuring efficient and safe water collection.

The project included:

  • Execution of grey works with high-strength reinforced concrete slabs and walls.
  • Assembly of metal structures and roofing, access platforms, and drainage systems.
  • Installation of equipment for rainwater management and a temporary power generator.
  • Implementation of safety systems, water channeling, and filtration.
  • Additional works to ensure operability and protection against rainfall.

This project strengthens the farm’s water infrastructure, optimizing the water supply for its agricultural operations.