Design, manufacturing, supply, transport, erection, tests and commissioning of the main and auxiliary Electromechanical Equipment (Turnkey package of the electromechanical part of the Project):
- Francis-type Turbine, horizontal shaft, Governor with Oil-hydraulic Unit, Three-phase Synchronous Generator, Excitation System, Butterfly Valve, SCADA, Electrical and Control Equipment, Tool set and Erection accessories.
- Grounding network in the house and Grounding panels for the Generating Unit, Lifting mechanisms (Hoist with its travel beam), Fire protection System (detection, alarm and extinguishers).
- Travelling Crane.
- Electromechanical and Integration Engineering of the equipment.
- Electromechanical Direction and Coordination.
- Progress control and Quality Management.
- Electrical and mechanical Auxiliary equipment.
- Hydromechanical Equipment (cranes, gates, servomotors, Hydraulic units, etc. for the Cañas Blancas Dam, La Paja Dam and Power House).
- Erection and Commissioning.
- Contaminated water, waste water and drinking water System.
- Compressed air, Ventilation and Flow measurement System.
- Penstock and Splitter (Y junction) of the Penstock.
- Design, Supply, Erection, Connection and Start-up of the Substation of 12.5 MVA Output – 13.8/230 KV, Civil and Electromechanical works, and the Construction of the 230 Transmission line until the Interconnection to the National Electric Network of the Republic of Panama.