San Bartolo Hydroelectric Power Plant
SAN BARTOLO HYDROELECTRIC PROWER PLANT, 20 MW
It is located in the Province of Veraguas over the San Pablo River. Consists of a CCR Dam of 40 m height with 85,000 m3, and 28,000 m3 of reinforced concrete. The Power House is at the base of the dam and will be installed two Kaplan-type Turbogenerator units for an installed power of 20 MW.
Services:
- Design, Manufacturing, Supply, Transport, Erection and Commissioning of the Power House Electromechanical equipment (Turnkey package of the electromechanical part of the Project)
- Manufacturing, Transport and Erection of metallic grids in the Dam area.
- Quality and Operation Tests of the equipment.
- Direction, Planning and Coordination of the electromechanical activities;
- Coordination and progress control of the Quality management and Commissioning.